True multi-layer 100% solids build
We install 100% solids epoxy base layers followed by custom color coats made from 100% solids epoxy mixed with metallic powder.
Metallic Epoxy Floors
One-of-a-kind decorative concrete floors built with 100% solids epoxy base layers, metallic pigment layers, and a clear polyurea topcoat that cures to a glass-like high-gloss finish.
Best for: Basements, bars, salons, showrooms, offices, feature interiors
Metallic epoxy is our signature decorative system for basements, showrooms, bars, salons, offices, and interior feature spaces across the Hudson Valley and Capital District. Every floor is poured and worked by hand on site, creating three-dimensional depth and swirling movement that no tile or vinyl plank can imitate.
We build metallic floors as a multi-day architectural system rather than a quick single coat. After diamond grinding the slab and filling cracks flush with a flexible two-part epoxy repair compound, we lay down 100% solids epoxy base layers followed by color coats of 100% solids epoxy mixed with metallic powder. Once the metallic design cures, we seal the floor with a clear polyurea topcoat applied by sprayer or dry-mop method, curing to a glass-like high-gloss finish.
Because each layer requires full cure time, metallic epoxy installations take 4 to 5 days minimum on site. During your free on-site estimate, we inspect the concrete, check moisture levels, and help you select a metallic palette that fits your space and lighting.
Benefits
We install 100% solids epoxy base layers followed by custom color coats made from 100% solids epoxy mixed with metallic powder.
Every metallic floor is sealed with a clear polyurea topcoat applied by sprayer or dry-mop method for a deep, mirror-like gloss.
Pigments are worked by hand on site, creating organic marbling and movement that cannot be duplicated by tile or plank flooring.
With no grout lines or joints to trap dirt, the smooth surface wipes clean with warm water and mild dish soap.
Choose from subtle silver and charcoal stone tones to bold multi-color metallic blends for basements, showrooms, bars, and offices.
Common Problems Solved
Plain basement or showroom concrete looks cold and unfinished
Metallic epoxy turns bare slabs into a seamless, high-gloss centerpiece with custom color movement.
Seams and grout lines collect dust and moisture
A poured-in-place epoxy and polyurea system creates a continuous, non-porous floor across the entire room.
Thin decorative coatings lose their shine quickly
A dedicated clear polyurea topcoat protects the metallic pigment layers underneath while keeping a glass-like high-gloss finish.
Our Process
We inspect the concrete, prepare the surface, repair eligible defects, install the selected system, and finish with a final walkthrough.
We review color palettes, check concrete moisture with a meter, and evaluate slab condition during your free on-site estimate.
We mechanically diamond grind the concrete and fill cracks with a fast-curing two-part epoxy crack filler ground flush with the floor.
We apply 100% solids epoxy base layers (including moisture vapor barrier protection on basement slabs) to create a flat, uniform foundation.
We pour and manipulate 100% solids epoxy mixed with metallic powder to build three-dimensional marbling and flow.
We apply a clear polyurea topcoat by sprayer or dry-mop method for a glass-like finish. Metallic installations take 4 to 5 days minimum on site.
Finish Options
Subtle single- or two-tone movement in silver, pearl, charcoal, or warm neutral tones.
Layered metallic pigments with bold veining and deep three-dimensional contrast.
Color combinations tailored to bars, salons, retail showrooms, offices, and finished basements.
Maintenance
Metallic epoxy floors keep their glass-like gloss with gentle, non-abrasive cleaning.
FAQs
After diamond grinding the slab and grinding two-part epoxy crack repairs flush, we apply 100% solids epoxy base layers, pour color layers using the same 100% solids epoxy mixed with metallic powder, and seal the system with a clear polyurea topcoat applied by sprayer or dry-mop method that cures to a glass-like high-gloss finish.
Because each 100% solids base coat, metallic design layer, and clear polyurea topcoat must cure in sequence, metallic systems require 4 to 5 days minimum on site, or longer if the slab needs extra moisture mitigation or repair work.
No two metallic floors are identical. The pigments flow and settle organically as they are worked on site, so sample photos guide the color palette and style while your floor gets a one-of-a-kind pattern.
The clear polyurea topcoat cures to a smooth, glass-like high-gloss finish, which can be slick when wet. Metallic systems are best suited to dry interior spaces like basements, showrooms, bars, salons, and offices rather than wet work bays.
Gallery Examples
An example of a finished floor by Next Level Epoxy Inc.
Schedule a free on-site estimate, with your quote the same day. Send a few details and photos and we will help you choose the right coating system.
Get a Free Quote